Barcelona Metro line 2
rapid transit line in Barcelona, Spain
Line 2, also known by the names of its termini, currently Paral·lel - Badalona Pompeu Fabra, is a metro line in Barcelona operated by TMB, coloured purple and sometimes simply called línia lila.
Chronology
change- 1995 - Sant Antoni-Sagrada Família section opened.
- 1996 - Sant Antoni-Paral·lel section opened.
- 1997 - Sagrada Família-La Pau section opened.
- 2002 - La Pau-Pep Ventura section moved from L4 to this line.
- 2010 - Pep Ventura - Badalona Pompeu Fabra section opened.
Technical details
change- Colour on map: Purple
- Number of stations: 18
- Type: Conventional metro
- Length: 13.1 km (8.1 mi)
- Rolling stock: 2100, 5000 and 9000 series
- Journey time: 24 minutes
- Track gauge: 1435
- Traction: Electricity
- Power supply: Rigid overhead wire
- Open-air sections: No
- Mobile phone coverage: Partial
- Depots: Verneda (Triangle Ferroviari)
- Operator: TMB
Stations
changeStation and line names shown in italics are planned or under construction additions.
- Terminal D (L9)
- Ciutat Aeroportuària (L9)
- Terminals A-B-C (L9)
- Sant Cosme (L9)
- El Prat Centre (L9)
- Estació del Prat (L1, L9, RENFE)
- Centre Direccional (L1, L9)
- Verge de Montserrat (L9)
- Mercabarna (L9)
- Parc Logístic (L9)
- Fira 2-Pedrosa (L9)
- Foc Cisell (L10)
- INEF
- Fira 1
- Poble Sec (L3)
- Paral·lel (L3, Funicular de Montjuïc)
- Sant Antoni
- Universitat (L1)
- Passeig de Gràcia (L3, L4, RENFE)
- Tetuan
- Monumental
- Sagrada Família (L5)
- Encants
- Clot (L1, RENFE)
- Bac de Roda
- Sant Martí
- La Pau (L4)
- Verneda
- Artigues-Sant Adrià
- Sant Roc (T5)
- Gorg (T5, L10)
- Pep Ventura
- Badalona Pompeu Fabra (L1)
- Casagemes
- Canyadó
- Morera (L13)