Sherbino Wind Farm

The Sherbino Wind Farm is in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which will be able to create 750 MW, is in operation. Phase I uses 50 Vestas V-90 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.[1]

Sherbino Mesa Wind Farm
Map
CountryUnited States
LocationPecos County, Texas
Coordinates30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W / 30.811000; -102.362000
StatusDecommissioned
Decommission dateJanuary 2021
Wind farm
Type
Power generation
Units operational110
Make and modelVestas V-90, Clipper Windpower C-96
Nameplate capacity300 MW
change

References

change