Sherbino Wind Farm
The Sherbino Wind Farm is in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which will be able to create 750 MW, is in operation. Phase I uses 50 Vestas V-90 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.[1]
Sherbino Mesa Wind Farm | |
---|---|
Country | United States |
Location | Pecos County, Texas |
Coordinates | 30°48′39.6″N 102°21′43.2″W / 30.811000°N 102.362000°W |
Status | Decommissioned |
Decommission date | January 2021 |
Wind farm | |
Type | |
Power generation | |
Units operational | 110 |
Make and model | Vestas V-90, Clipper Windpower C-96 |
Nameplate capacity | 300 MW |
Related pages
changeReferences
change